17. Calibrate and align all print heads
If the print head has been installed before the factory, only need to calibrate the Base step,
Refer to the figure below. As shown :
If the print head has just been newly installed, perform the following calibration steps:
Refer to the figure below. As shown :
All steps calibration complete, test print some jobs.
Add: No.6-2, Jinhua Zhong Road,Zhongshan
Tel: 86-760-88667090
Fax: 86-760-88667096
E-mail: betty@titanjet.com.cn
vivian@titanjet.com.cn
market2@titanjet.com.cn
market3@titanjet.com.cn